Part 25 - Bumthang arrival, plans, and Haat stay (7–10 October)

Identity area

Reference code

GB 235 LSH/1/1/10/1/25

Title

Bumthang arrival, plans, and Haat stay (7–10 October)

Date(s)

  • 1933-10-07 - 1933-10-10 (Creation)

Level of description

Part

Extent and medium

1 page

Context area

Name of creator

(1898-1967)

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

SUMMARY:
Arrived in Bumthang, met by Tasho at Kurji; Hicks arrived later due to Trinley’s septic foot. Plans set to leave on 13 October, with Gundra and Basang going on 9 October to Sephu, Omta Tso, Thampala, and Ritang; received news from home written 8 September and discussed Tasho’s behavior toward Raja Dorji. From 8–10 October at Haat, with heavy rain and a meal with HH on the 8th.

CONTENT:
7th October. Bumthang. Arrived here at 8:30, along a very wet path. There had been a thunderstorm and very heavy rain in the night, - but was worse down this way: Tasho met us in Kurji, where we again stay, and here there was no news of Hicks. But a letter came in from him at 10:00 saying he would be in today, and he arrived at 1:30. He was late because Trinley, Ashi Wangmo's man who has been with him, got a septic foot and couldn't walk any further. So now our plans are all made, we will leave on 13th October, and Gundra and Basang will go on 9th for their little trip to Sephu, Omta Tso, Thampala and Ritang. Tasho only arrived yesterday himself. Got a mail, and Betty is getting on well, written on 8th September from home. Tasho stayed for a long time till after Hicks arrived and I had a pretty good talk to him about various things, including his behaviour to Raja Dorji in Kalimpong, and the way he changed his mind and did just as he wanted to irrespective of anyone else. I hope all that did good, and Tasho took it really very well.

8th - 10th October. Haat. A good deal of rain, some very heavy indeed, but a good deal of sun too. We had a meal with HH on 8th and stayed there for some

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

    Script of material

      Language and script notes

      Physical characteristics and technical requirements

      Finding aids

      Allied materials area

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Related descriptions

      Notes area

      Alternative identifier(s)

      Access points

      Subject access points

      Place access points

      Name access points

      Genre access points

      Description control area

      Description identifier

      Institution identifier

      Rules and/or conventions used

      Status

      Level of detail

      Dates of creation revision deletion

      Language(s)

        Script(s)

          Sources

          Digital object (External URI) rights area

          Digital object (Reference) rights area

          Digital object (Thumbnail) rights area

          Accession area